Our Projects
Project Name: Papatoetoe High School – Block E Upgrade
Location: Papatoetoe High School
Start date: Jan 2026 – Completion date: Feb 2026
Total contract value: $724,500




Stak Construction delivered the Block E window replacement and internal upgrade works within a live school environment, requiring careful staging and coordination to minimise disruption to day-to-day operations.
The primary scope involved replacing 64 existing timber windows with double-glazed aluminium joinery, significantly improving performance and durability. This was followed by a full internal upgrade, including new floor coverings, wall linings, architraves, and painting, all programmed to run efficiently alongside the joinery works.
Due to the presence of asbestos cladding, the project required strict control measures, including licensed removal support and daily air monitoring to ensure a safe environment for staff, students, and workers at all times.
Works were carefully staged and coordinated with the school, with classrooms handed back on time and internal finishing completed after hours to avoid disruption. Early procurement and strong supplier coordination ensured all materials, including large feature windows, were delivered and installed without impacting the programme.
The project was completed safely, on time, and to a high standard, reinforcing Stak Construction’s capability in delivering complex upgrade works within live education environments.
Project Name: Pakuranga HeightsPrimary School – Re-Cladding, roofing works & Internal Upgrade Works
Location: 77 Udys Rd, New Zealand
Start date: Dec 2025 – Completion date: Feb 2026
Total contract value: $230,000




Stak Construction delivered a comprehensive upgrade at Pakuranga Heights Primary School.
The primary scope involved the removal of existing asbestos cladding and full re-cladding of the building, along with the installation of new aluminium joinery to improve durability and weather performance. As part of the external works, we also completed a full roof replacement, along with roofing works to an additional building where the existing membrane roof was removed and replaced with a new system. To enhance usability, a new canopy structure and deck area were constructed, providing covered area and improved outdoor space for students and staff.
Internal works included a complete refurbishment of learning spaces, delivering new floor finishes, wall linings, ceilings, and associated upgrades in line with Ministry of Education standards. A separate block also underwent a full toilet refurbishment, including new sanitary fixtures, cubicles, and finishes.
Project Name: Baverstock Oaks School – Office Fit-Out & Reception Upgrade
Location: 21 Baverstock Road, Flat Bush, Auckland
Start date: Jan 2026 – Completion date: Feb 2026
Total contract value: $52,500




Stak Construction delivered a modern office fit-out and reception upgrade at Baverstock Oaks School, transforming the existing space into a functional and welcoming administrative environment. Custom joinery was installed throughout, featuring woodgrain finishes to create a warm and professional finish across all areas.The reception was designed as a key feature of the space, including a curved front desk with integrated Autex acoustic linings, LED lighting.Works also included upgraded lighting systems, relocation of electrical services, tinted glazing, and full integration of power and data throughout the workspace. A feature wall incorporating the school’s branding was installed to enhance the overall identity of the space.
Project Name: Sutton Park School – Toilet Refurbishment Works
Location: 89 Vine Street, Māngere East, Auckland
Start Date: Dec 2025 – Completion date: Feb 2025
Total contract value: $181,500




Stak Construction delivered toilet refurbishment works at Sutton Park School, upgrading student facilities across multiple blocks to improve durability, functionality, and overall hygiene standards.The primary scope involved refurbishment of toilets in Blocks 5, 10, and 12, including full removal of existing sanitary ware, partitions, floor finishes, and fixtures. New vinyl flooring systems were installed with full floor preparation and coving, along with new sanitary fixtures, partitions, and hardware.Wall finishes were upgraded with the installation of Resco linings over existing substrates, alongside new lighting and ventilation systems to enhance performance and usability of the spaces. Plumbing works included installation of new pipework, mixer taps, and full services integration to support the upgraded facilities.The project required careful staging and coordination, with works programmed around school operations and holiday periods to minimise disruption to students and staff.
Project Name: Kelston School – Block 1 Classroom Refurbishment
Location: 5 Archibald Road, Kelston, Waitakere
Start Date: June 2025 – Completion date: Oct 2025
Total contract value: $414,000




Stak Construction delivered the refurbishment of Block 1 classrooms at Kelston Primary School, upgrading teaching spaces to meet current Ministry of Education DQLS standards.
The primary scope involved lifecycle replacement of internal finishes, including removal of existing carpets and wall linings, and installation of new carpet tiles and acoustic wall coverings (Autex). New suspended ceiling systems and lighting were installed to improve acoustic performance and overall functionality of the learning spaces.
Additional works included internal make-good, painting, and services upgrades to deliver a complete internal refresh across the classrooms.
Project Name: Bayview School Block 1 Classroom refurbishment
Location: 60 Bayview Road, Bayview, Auckland
Start Date: March 2025 – Completion date: July 2025
Total contract value: $172,500




Stak Construction delivered the refurbishment of Block 1 classrooms at Bayview School, upgrading teaching spaces to improve functionality, durability, and overall learning environments.
The works included a full internal upgrade across classrooms, incorporating new floor finishes, wall linings, ceilings, and associated joinery and fittings, all completed in line with Ministry of Education standards.
The project was delivered within a tight holiday programme, requiring efficient planning, coordination, and sequencing to ensure all works were completed on time and ready for the start of term.
Working within a live school environment required a strong focus on safety, clear communication, and careful site management. The project was completed to a high standard, demonstrating Stak Construction’s ability to deliver quality refurbishment works within strict timeframes.
Project Name: Waitoki School – Toilet Refurbishment Works
Location: 1119 Kahikatea Flat Road, Waitoki
Start Date: Dec 2024 – Completion date: Jan 2025
Total contract value: $136,550
Stak Construction delivered toilet refurbishment works at Waitoki School, upgrading student facilities across Blocks 3 and 4 to improve durability, functionality, and hygiene standards.The scope involved the full refurbishment of two existing toilet blocks, including removal of existing sanitary ware, partitions, and floor finishes. New vinyl flooring systems were installed with full floor preparation, along with new sanitary fixtures, partitions, and associated hardware.Works also included upgrades to plumbing services, ventilation systems, and lighting, ensuring the facilities met current Ministry of Education requirements and improved overall usability of the spaces.The project was delivered during a school holiday programme, requiring efficient planning and coordination to ensure all works were completed within a constrained timeframe and ready for the start of term.
Project Name: Aorere College – Super Loo Construction
WorksLocation: 2 Selfs Road, Papatoetoe, Auckland
Start Date: Sep 2024 – Completion date: Nov 2024
Total contract value: $805,000




Stak Construction delivered a new standalone toilet block at Aorere College, providing upgraded facilities to support the growing needs of the school.
The works included full construction of the building, along with the installation of sanitary fixtures, partitions, flooring, lighting, and complete plumbing and services integration. The project was delivered as a complete, turnkey solution from groundworks through to final finishes.
All works were carefully planned and staged within a live school environment, with a strong focus on safety, coordination, and minimising disruption to students and staff.
The project was completed on programme and to a high standard, reinforcing Stak Construction’s capability in delivering new-build facilities within operational education environments.
Project Name: Taupaki Primary School – Blocks 1, 2 & 5 Upgrade Works
Location: 14 Cottle Road, Taupaki
Start Date: Sep 2024 – Completion date: April 2025
Total contract value: $690,000




Stak Construction delivered upgrade works at Taupaki Primary School, with the primary scope focused on seismic strengthening of existing classroom buildings to improve structural integrity and long-term performance. The works involved the installation of over 42 new foundation piles beneath the classrooms, along with the addition of exposed cross bracing within the ceiling structure, providing both structural stability and a visible reinforcement of the building’s framework. These works required careful planning and coordination within a live school environment. Alongside the structural works, Stak completed toilet refurbishment works to Blocks 1, 2 and 5, including new sanitary ware, partitions, floor finishes, wall linings, and plumbing upgrades in line with Ministry of Education standards. Additional works included roofing repairs and upgrades, joinery replacements where required, and internal upgrades within the technology block, delivering a comprehensive improvement across multiple areas of the school. The project involved multiple workstreams across structural, roofing, and internal upgrades, requiring efficient staging, strong health and safety controls, and close coordination with the school. The project was completed to a high standard, demonstrating Stak Construction’s capability in delivering complex structural and refurbishment works within active education environments.




Project Name: Ambler Cafe & Bistro
Location: 181 Point Chevalier Road, Point Chevalier, Auckland
Start Date: Feb 2024 – Completion date: June 2025
Total contract value: $250,000
A small café renovation recently completed for one of our valued clients — combining a full interior remodel with a seismic strengthening upgrade to this beautiful heritage building. This project involved careful planning, structural remediation, and discreet installation of new portal frames and bracing systems to bring the building up to modern standards while preserving its original character and charm. Our team worked closely with engineers, architects, and the client to ensure every stage was completed to the highest level of craftsmanship.  From refreshing the café dining areas to enhancing the kitchen and service spaces, every detail was considered to create a warm, functional environment ready for many more years of community use. Proud to deliver quality work that blends modern safety requirements with heritage preservation. Big thanks to our client for trusting us once again — always a privilege to bring their vision to life
Project Name: Mangere East Primary School – Block 6 DQLS & ILE Upgrade
Location: 21 Yates Road, Māngere East, Auckland
Start Date: March 2024 – Completion date: Sep 2024
Total contract value: $287,500




Stak Construction delivered a comprehensive upgrade to Block 6 at Mangere East Primary School, transforming three existing classrooms and adjoining facilities into modern, flexible learning environments.
The project involved reconfiguring classrooms 18, 19, and 20, including the creation of new openings between spaces to improve connectivity and visibility, along with the construction of breakout areas. Existing toilets and cloak bays were upgraded as part of the works, alongside full lifecycle replacements of floor coverings, wall linings, lighting, and heating systems to meet Ministry of Education DQLS standards.
Additional works included installation of new aluminium windows and doors, sliding glass doors to connect to future outdoor learning areas, structural steel installation, new external cladding, and full internal finishes including painting, flooring, and acoustic wall coverings.
The project was carefully staged across multiple work areas, including toilet upgrades and classroom reconfigurations, with sequencing managed to maintain programme efficiency and minimise disruption within the live school environment.
Delivered during a combination of school term and holiday periods, the project demonstrates Stak Construction’s ability to manage complex upgrades, coordinate multiple trades, and deliver high-quality outcomes within active educational settings.
Project Name: Papatoetoe High School – Blocks C & S DQLS Upgrade and Block H Toilet Refurbishment
Location: 19 Nicholson Avenue, Papatoetoe, Auckland
Start Date: Oct 2023 – Completion date: Dec 2024
Total contract value: $805,000




The primary scope involved toilet refurbishment works to Block C and Block H, including replacement of sanitary ware, partitions, floor finishes, wall linings, and associated plumbing and services upgrades. These works significantly improved functionality, durability, and overall usability of the facilities.
Additional works included the installation of new floor finishes and acoustic wall linings (Autex) within corridor areas, enhancing both the durability and acoustic performance of high-traffic spaces.
All works were carefully staged and coordinated to ensure minimal disruption to the school’s daily operations, with a strong focus on health and safety throughout the project.
The project was completed to a high standard, demonstrating Stak Construction’s ability to deliver targeted upgrade works efficiently within active education environments.
Project Name: Borich road - house renovation and deck works
Location: Borich road West Auckland.
Start Date: June 2022 – Completion date: Sep 2022
Total contract value: $60,000




STAK Construction completed a full residential refurbishment at a private dwelling in Glen Eden, involving both interior and exterior upgrade works to improve the overall condition, functionality and appearance of the home. The project included a full exterior chemwash and repaint of the house, along with repainting of boundary fencing to restore the external finish. Internally, works involved repairs to damaged wall linings, full interior painting, and the replacement of multiple internal and wardrobe doors including new hardware throughout. Bathroom upgrades were undertaken, including floor repairs due to water damage, installation of a new shower system, and a new vanity unit. Plumbing connections were carried out to suit the upgraded fixtures. The existing kitchen was demolished and replaced with a new kitchen installation, including cabinetry, engineered stone benchtops, and new appliances. Additional works included window sill repairs and finishing details to ensure a consistent standard across the home. Externally, STAK Construction also completed new decking and balustrade works, including structural strengthening, installation of new timber decking, and compliant balustrade construction to improve safety and usability of the outdoor space. The project was delivered with a focus on quality finishes, coordination of multiple trades, and efficient programme management within an occupied residential environment.
Project Name: Pigeon Mountain Primary School – Outdoor Learning Environment & Canopy Installation
Location: 22 Wells Road, Bucklands Beach, Auckland
Start Date: May 2022 – Completion date: Jan 2023
Total contract value: $465,750




Stak Construction delivered a purpose-built outdoor learning environment at Pigeon Mountain Primary School, creating a flexible and engaging space for students. The project included the design and construction of a full wrap-around steel canopy, providing all-weather protection while maintaining a cost-effective and durable solution. This new covered area enhances outdoor learning opportunities, allowing students to utilise the space year-round in a safe and functional environment.




Project Name: Sylvia Park School – AMS Upgrade & Breakout Learning Space
Location: 3 Longford Street, Mount Wellington, Auckland
Start Date: Aug 2022 – Completion date: Nov 2022
Total contract value: $264,500
Stak Construction delivered refurbishment works at Sylvia Park School, upgrading existing classroom spaces to improve functionality, durability, and overall learning environments.
The primary scope involved internal upgrades across classrooms, including removal of existing finishes and installation of new floor coverings, wall linings, and ceiling systems in line with Ministry of Education standards. Lighting and associated services were also upgraded to enhance performance and usability of the spaces.
The project required careful staging and coordination, with works delivered within a live school environment. Strong planning and communication ensured minimal disruption to staff and students while maintaining programme.
The project was completed to a high standard, demonstrating Stak Construction’s ability to deliver quality refurbishment works within active education environments.